Content provided by Felipe Engineer Manriquez. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Felipe Engineer Manriquez or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://staging.podcastplayer.com/legal.

What if resistance to change wasn’t a problem, but an opportunity? In this episode of The EBFC Show, Victor Ortiz and host Felipe Engineer-Manriquez explore how embracing resistance to the Last Planner System can actually drive clarity, foster trust, and create better outcomes in construction projects. 🚧

As we continue our series on mastering the Last Planner System, Victor dives deep into the practical strategies that transform this Lean Construction framework into a tool for optimizing collaboration and efficiency.

📌 Key Takeaways You’ll Gain:

  • How resistance reveals gaps and creates opportunities for clarity and growth.
  • The role of trust and constraint analysis in building stronger project teams.
  • The value of forward-thinking adjustments and the strategic use of buffers to prevent delays.
  • Insights into PPC (Percent Plan Complete) and resource management to enhance performance.
  • Practical steps for implementing the Last Planner System effectively in real-world scenarios.

If you’ve faced pushback when adopting new methods or struggled to align teams with Lean principles, this episode is for you. Learn how to turn resistance into a stepping stone for innovation and success.

🎧 Listen now and don’t forget to like, share, and subscribe for more insights on transforming construction practices! 🚀

Episode References:

Interrupt Buffers Blog Post link: https://www.theebfcshow.com/blog/the-interrupt-pattern-for-design-and-construction-teams/

Part 2: Fake Last Planner System with Victor Ortiz https://www.theebfcshow.com/Victor-Ortiz-LPS-Part2/

Part 1: Transforming Construction: Last Planner System Deep Dive with Victor Ortiz https://www.theebfcshow.com/LPS-with-Victor-part1/

Books

“Built to Fail” by Todd R. Zabelle

Amazon Link: https://amzn.to/3B78bWX

“How to Make Meetings Work!” by Michael Doyle and David Straus

Amazon Link: https://amzn.to/3RxVv0U

---

Connect with Victor via

LinkedIn at https://www.linkedin.com/in/victor-ortiz-671301/

Connect with Felipe via

Social media and Free Lean and Scrum Training Resources at https://thefelipe.bio.link

RSM Podia Course Link: https://store.theebfcshow.com/rsm

Subscribe to never miss new videos here: https://click.theebfcshow.com/youtube

Watch The EBFC Show Podcast https://click.theebfcshow.com/YouTube-Podcast

---

Today's episode is sponsored by the Lean Construction Institute (LCI). This non-profit organization operates as a catalyst to transform the industry through Lean project delivery using an operating system centered on a common language, fundamental principles, and basic practices. Learn more at https://www.leanconstruction.org

Elevate your construction career and enhance your company's performance by mastering the crucial aspect of building enclosure management with Field Verified's specialized training. Address the major challenge of managing building enclosures, a common source of construction failures. Get hands-on learning experience with real-world construction scenarios and mock-up installations for skill-building with leadership and team-focused strategies. By joining our course, you gain access to a proven program that not only covers technical aspects but also better practices for effective construction management. Don't miss this opportunity to transform your approach. Visit https://fieldverified.com for more insights, or contact us at 480-719-5090.

  continue reading

112 episodes