Artwork
iconShare
 
Manage episode 443304066 series 2656882
Content provided by Unbuild It Podcast. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Unbuild It Podcast or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://staging.podcastplayer.com/legal.

After the boys were done taking jabs at each other, they each take this question and apply it to their fields: building (Jake), designing (Steve), and enclosure review (Pete). Much of the discussion centers on the cost and expectations that both building professionals and clients have or should set with each other. Another central theme is that pulling in expertise early in the design process may seem as though it is more costly. Still, in the long run, it is better to spend a bit upfront and get key input during design rather than costly changes deeper into the build process. Interestingly, the conversation went from cost to trust as a key element of Pre-Construction.

Pete's Resources:

1. Building-Wright Design-Spec Review (attached - to post on UBIP website)

2. The Graph for "Cost of Changes versus Influence on Performance" - https://www.semanticscholar.org/paper/Construction-Total-Project-Management-Planning-Yates-Eskander/a80823cef0f3eb925e516cfb3b96253434cdb0a8

3. Build Show Wade Paquin "Pre-construction Service: What Is It? - https://www.youtube.com/watch?v=cyPmO6AjC0M

  continue reading

162 episodes